| Quality
Control Policy |
To
ensure highest level of quality, the bottles are checked throughout
the manufacturing process, the blow moulding process by the machine
operator, online Quality Control inspectors, packers and other quality
control personnel from start to finish.
|
|
Incoming
Raw Material
|
Quality
assurance department tests and approves all incoming raw material before
any material is used.
|
|
Moulding
Inspection
|
Approval
stage of first piece
|
|
Quality
Assurance Department approves this inspection before any material is used.
|
Online
checks are made in the following cases:
The entire production is checked at regular intervals.
In lab QC checks are made on all products after each process i.e., Blow
moulding, Injection moulding, fluorination, printing and packaging before
despatch.
Each checks is attested with Quality Control Certificate by Quality
the Control Head.
|
|
Bottles/Containters
and inserts (First piece/In process)
|
- Physical
appearance/deformities
- Complete
moulding of threads and closure rings
- Bloom
Standard leak test
- Uniform
thickness (Bottles only)
- Neck
chamber and thread moulds (Bottles Only) dimension tests
|
| |
|
|
|
©
BPPL All rights reserved 2006
|
Website
Designed and maintained by Agrinet Solutions
|
|